A house demolition goes smoothly when the prep is done right. Use this checklist in the weeks before your teardown. Your contractor should help with most of it.
4 to 8 weeks before
- Get a written demolition scope and quote that includes haul-off, foundation work, and site cleanup.
- Schedule the asbestos inspection. Utah requires one before most building demolition.
- Contact your gas and electric utilities to schedule disconnects.
- Contact your city about water shut-off, sewer capping, and the demolition permit.
- Tell your neighbors the approximate dates. It goes a long way.
2 to 4 weeks before
- Remove everything you want to keep, including fixtures, appliances, doors, cabinets, or materials you want to salvage.
- Decide whether to donate or sell usable items such as cabinets, appliances, and lighting.
- Arrange a cleanout for remaining contents. We can clear the house and demolish it in one job.
- Complete any asbestos abatement the inspection calls for.
- Confirm with your builder what should stay: trees, fences, driveway, or utilities.
The week before
- Confirm that utilities are disconnected and the permit is issued.
- Make sure Blue Stakes (811) locates are requested if foundation or footing removal is included.
- Move vehicles, trailers, and anything else out of the work area.
- Mark sprinkler heads, septic components, and anything buried that you know of.
Demolition day and after
Expect heavy equipment, trucks, noise, and some dust. We use water for dust control and keep the street and sidewalk clean. Once the structure is down, the debris is sorted and hauled, and foundations come out if they're in the scope. The lot is rough-graded and left safe.
Ready to plan your project? See house demolition, request a free walkthrough, or call 385-408-9910.